Investigation Into The Causes Of Blocked Drainage, Canal And Culvert In Ilorin-west Local Government Area
[A CASE STUDIES OF AGBO-OBA, OJA-TUNTUN AND SAWMILL] -
-
-
Table 4.3 shows that 20% 0f the respondents claimed that blockage in drainage, canal and culvert are caused by lack of inadequate drainage, 40% of respondents claimed that blockage are caused by illegal dumping of refuses along the line of drain which is the principal causes of flooding, 20% of respondents claimed that blocked is caused by illegal structure, 10% of respondents claimed that blockage is caused by non-channelization.
-
-
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTDrainage is an essential component of road construction. In most designs of the road, the first thing to be put in place is drainage system. The presence of blockage in drainage system tends to reduce the carriage capacity of drainage and thereby affect life span of the road. The research employed a research survey in order to obtain the information that would describe the causes of blocked drainage, canal and culvert in Ilorin-west local government road and its effect on the surrounding ... Continue reading---
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTDrainage is an essential component of road construction. In most designs of the road, the first thing to be put in place is drainage system. The presence of blockage in drainage system tends to reduce the carriage capacity of drainage and thereby affect life span of the road. The research employed a research survey in order to obtain the information that would describe the causes of blocked drainage, canal and culvert in Ilorin-west local government road and its effect on the surrounding ... Continue reading---