Investigation Into Level Of Services
[A CASE STUDY OF EGBEJILA ROAD] -
-
-
The peak flow rate for interrupted road
TRAFFIC VOLUME FOR THE SECOND WEEK
From table the average traffic volume is calculated as mathematically
The peak flow rate for interrupted road
TRAFFIC VOLUME FOR THE THIRD WEEK
From table the average traffic volume is calculated as mathematically
The peak flow rate for interrupted road
-
-
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTThis project was executed in order to investigate into level of service of Egbejila Road Ilorin west Local Government Kwara State and improvement options. It was carried out to determine the rigidity quality, traffic characteristics and traffic volume study of the road, which was put into consideration in order to know what really cause the failure and how to determine the improvement option for such road. It was also discussed; some of the possible effect of contraction which lea ... Continue reading---
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTThis project was executed in order to investigate into level of service of Egbejila Road Ilorin west Local Government Kwara State and improvement options. It was carried out to determine the rigidity quality, traffic characteristics and traffic volume study of the road, which was put into consideration in order to know what really cause the failure and how to determine the improvement option for such road. It was also discussed; some of the possible effect of contraction which lea ... Continue reading---