    • 3.6     OPERATION OF TNMER RELAY
      Timer relay are based on the electromagnetic induction principle which can only be applied where the actuating quantity or quantities A.C, they cannot be operated by D.C, since we are primarily concerned with an A.C system. This may be good place to restate a basic principle which should be kept in the back every operations mind.
      Relay operate for the reason only
      (i)    The AC quantity to which the relay respond has reached the setting for which the relay is calibrated
      (ii)    The timer relay contactor are closed some mechanism mean. This could be when time of change from utility supply to generator is reach in the panel or by someone poking the contactor either accidentally of intentionally and sometimes removing or replacing a timer relay cover will cause a relay to operate.
      3.7     PRINCIPLE OF OPERATION
      The change-over panel consists of two (2) 100A circuit breaker which serves as a means of isolation and at the same time a protective device. The circuit breaker A is used to feed in the utility supply to the system while circuit breaker B is used to feed in the generator set supply to the system. Also in the panel, there are six (6) contactors, which are electromagnetic device that are design to carry current of difference capacities. Contactor A is load contactor that carries the utility supply to the load while B is equally a load contactor that carries the generator set supply to load. Contactor C is a control contractor which equally serve as relay the contractor is also been in operated with a relay timers monitor the function of the utility power contractor  or load contractor. The stop button is connected to supply from the red ohase through the normally close (NC) of the stop button to the contractor. Contractor C is equally meant to carry DC supply through the contractor for the purpose of supplying the contractor F.
      Contractor D serves the same function as that of C but is only monitor the generator set load contractor with the help of the timer on it. The relay timer on contractor D helps in relaying the operation of contractor D helps in relaying the operation of contractor B so that the generator set will not be loaded before it maintain stability.
          Contractor E is mean to discharge the work of the kick starter on the generator set and to equally control work of operator D when the generator must have given out an output.
          Contractor F is a DC contractor of the 12v. it is used to start the kick starter of the generator set. It is connected through the
      P= IL VcosѲ
      But it is 3 Phase
      ... P=3L VcosÏ´
      P= power supply in watts
      Where
      IL= load current in Ampere
      V= supply voltage in volts
      Cos = power factor (p.f) but p.f ... cosec 0.8
      P = 50KVA
      IL=?  
      V = 415V (3phase)
      ... IL =
      Since we cannot set material for exactly 86.9A, therefore we decide to choose for 100A and also for future extension.

  • CHAPTER THREE -- [Total Page(s) 4]

    Page 4 of 4

    Previous   1 2 3 4
    • ABSRACT - [ Total Page(s): 1 ]ABSTRACT    The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outage.    Power instability or outage in general does not promote development in the public and private sector. The inventors do not feel secure to come into a country with constant or freq ... Continue reading---

         

      APPENDIX A - [ Total Page(s): 1 ]BILL OF ENGENEERING MEARSUREMENT AND EVALUTION (BEME)The table below shows the cost estimate in naira and kobo of constructed automatic change-over panel.Bill of Engineering Measurement and Evaluation ... Continue reading---

         

      TABLE OF CONTENTS - [ Total Page(s): 1 ]TABLE OF CONTENTS Title Page   Certification   Acknowledgements  Abstract   Table of Contents   CHAPTER ONE1.1    Introduction  1.2    Aim and Objective of the Project  1.3    Scope of the Project CHAPTER TWO2.1    Literature Review  2.2    Manual Change-over Switch  2.3    Automatic Change-over Switch  2.4    Related Work 2.5    Reasons for Automatic Change-over Switch  2.6    Problems of Automatic Change-over Switch  CHAPTER THREE3.1    Methodolog ... Continue reading---

         

      CHAPTER ONE - [ Total Page(s): 1 ]CHAPTER ONE1.1    INTRODUCTION     Power instability in developing countries creates a need for automation of electrical power generation or alternative sources of power to back-up the utility supply. This automation is requiring as the rate of power outages become predominantly high. Research in the field of electrical electronics engineering has led to the tremendous discovers and inventions especially in the area of automation and power control. These invention have been useful in solvi ... Continue reading---

         

      CHAPTER TWO - [ Total Page(s): 4 ]The circuit diagram of the flip flop and switching transistor stage of the related art.Another related art was the development of a single phase automatic change-over switch. This also related to the present invention i.e. it switches electrical power supply from public supply to generator in the event of a power outage or insufficient voltage but it is apply to single phase system while the present invention is apply to three (3) phase system, moreover, the system uses an electronic control cir ... Continue reading---

         

      CHAPTER FOUR - [ Total Page(s): 4 ]CHAPTER FOURCONSTRUCTION4.1    LIST OF COMPONENT USEDThe following electronic components used in the project are list below(1)    Voltmeter (2)    Casing (3)    Vero-Board(4)    Transformers DC 12V(5)    Diodes (6)    Capacitors 100(7)    Resistors 4k(8)    Contactors (9)    16mm2 Cables(10)    1ooAmp connector (11)    Bolt and Nuts(12)    Indictor light (13)    Relay three phase (14)    555IC timer 4.2    VERO BOARD: is a brand of strip-board, a p ... Continue reading---

         

      CHAPTER FIVE - [ Total Page(s): 1 ]CHAPTER FIVE5.1     CONCLUSION    The automatic change-over switch has immense advantage in every area where power is required it is a fact that there is hardly any aspect of human life were electrical power is not required, at home, offices, hospital, etc.    It find a wide application scope, wherever the re-ability of electrical supply is necessary, for switching to an alternative source from main.5.2     RECOMMENDATIONThe automatic change-over switch is needed in every home and of ... Continue reading---

         

      REFRENCES - [ Total Page(s): 1 ]REFERENCEB.L. and A.K. Theraja (1997): Electrical Technology, S. chand company LTDEngr. A.O Aduloju (2003): Electrical Power System, Evidence Nigeria VentureEngr. M.B Jenyo (2007): Electrical Power System III & IV lecture Notes, UnpublishedEngr. T.A. Mustapha (2006): Electrical Power System I & II inn lecture Notes, unpublishedInternet Research: http://www.electricalsolution.comM.S. Ahmed, A.S. Mohammed & C.B. Augusibo (2006): Development of a single Automatic change-over switch Federal Universi ... Continue reading---