-
Design And Construction Of Automatic Change-over For Three Phases
-
-
-
REFERENCE
B.L. and A.K. Theraja (1997): Electrical Technology, S. chand company LTD
Engr. A.O Aduloju (2003): Electrical Power System, Evidence Nigeria Venture
Engr. M.B Jenyo (2007): Electrical Power System III & IV lecture Notes, Unpublished
Engr. T.A. Mustapha (2006): Electrical Power System I & II inn lecture Notes, unpublished
Internet Research: http://www.electricalsolution.com
M.S. Ahmed, A.S. Mohammed & C.B. Augusibo (2006): Development of a single Automatic change-over switch Federal University of Technology Minna.
US patent issued (2002):Automatic Generator switch-over Device for power source, http://www.patentstorm.us
-
-
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outage. Power instability or outage in general does not promote development in the public and private sector. The inventors do not feel secure to come into a country with constant or freq ... Continue reading---
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outage. Power instability or outage in general does not promote development in the public and private sector. The inventors do not feel secure to come into a country with constant or freq ... Continue reading---
REFRENCES -- [Total Page(s) 1]
Page 1 of 1
REFRENCES -- [Total Page(s) 1]
Page 1 of 1